RECYCLED & ALTERNATE MATERIALS
Keep what's there, reuse what you can, and buy new last. This rule applies to every material, so it lives on the design page instead of a product page.
Green Materials compares products you're going to buy. This page is about the decision that comes before that list: what doesn't need to be bought at all. That decision covers the structure already standing, a beam from a barn coming down, or trim made from offcuts. The order is always the same. Keep it, reuse it, then use recycled content, then bio-based, and buy new last. Each step down costs more material and more carbon. Our Santa Cruz ADU was built around a recycled fir beam, with finger-jointed poplar trim and eucalyptus and bamboo floors.
US construction & demolition debris
600 MILLION TONS in 2018
That's the EPA's estimate. It is more than twice the weight of all the household and business trash the country throws away.
Share of that debris from demolition
OVER 90%
New construction makes less than a tenth of it. The biggest saving comes from not tearing down, not from tidier job-site scraps.
Hempcrete
ABOUT R-2.2 PER INCH
Hempcrete is a non-structural, bio-based wall fill. That's roughly two-thirds of a fiberglass batt per inch, so walls run about a foot thick. It's now in an appendix of the national residential code.
Why it's a design decision
Salvage is found, not ordered. It has to be in the drawings before the material list exists, or it never makes it in.
THE GREENEST BUILDING IS ALREADY STANDING
Demolition makes nearly all construction waste. A sound foundation, frame or roof kept in place does more than any recycled product can. On a remodel, the first question is what stays.
REUSE SETS THE DIMENSIONS
A reclaimed beam comes in the length and depth it comes in, so the span is drawn around it, not the other way round. That only works if the piece is found during design, not during framing.A reclaimed beam comes in the length and depth it comes in, so the span is drawn around it, not the other way round. That only works if the piece is found during design, not during framing.
BUILD FOR THE NEXT TEAR-DOWN
Screws instead of glue where it doesn't matter structurally. Standard sizes. Materials that come apart cleanly. Whatever we build now becomes someone's salvage later, and that's decided by how it's put together.
Frequently Asked Questions
Is reclaimed lumber safe to build with?
Often it's better than new. Old-growth timber tends to be denser and more stable. For structural use it has to be graded first, and checked for hidden nails, rot and insect damage. Painted wood from before 1978 is tested for lead before anyone cuts it indoors.
Graded before it carries a load
Doesn't salvage cost more?
Sometimes. Salvage trades material cost for labor: finding it, de-nailing it, milling it. Recycled-content commodity products like cellulose insulation are usually priced close to the new alternative. We price the reused option next to the new one and let you choose with the numbers in front of you.
Priced side by side, never assumed
Should we build with hemp?
If carbon is the point of the project, it's worth a serious look. Hempcrete isn't structural, so it fills around a wood frame. Its code appendix is national, but each state decides whether to adopt it. Minnesota had a proposal to adopt it in 2025. We check where your jurisdiction stands before it goes on a drawing.
See Timber Framing & High R-Value Assemblies
What the package covers
WE LOOK FOR
-
What on the site can stay: foundation, frame, roof, finishes
-
Salvage sources for beams, flooring, doors and fixtures
-
Recycled content in commodity layers: insulation, sheathing, drywall
-
Bio-based options where code and crews allow
WE CHECK
-
Structural grading of any reclaimed member
-
Lead paint on anything painted before 1978
-
Recycled-content claims by certificate, not by brochure
-
Local code acceptance before an alternative goes on the drawings
WHAT WE WON'T DO
-
Reuse something that weakens the envelope, like old single-pane windows
-
Call a product recycled because one ingredient is
-
Specify a material no local crew or inspector knows, without saying so
-
Send reusable material to the dumpster on our own jobs